Renovate 2-Story Space as Church
Ankara Baptist Church International in Ankara / Turkey
Project Challenges
1) A large two-story apartment was purchased for the Church. We attained all of the relevant building and usage permits for our customer.
2) Because the apartment building where the new Church is located is used for residences, we needed to completely soundproof the Main Sanctuary; we installed sound attenuation panels on all wall and ceiling surfaces. It was not necessary to soundproof the floor areas as the downstairs was owned and occupied by the Church - Though we did use carpet as a sound inhibitor.
2) Because the apartment building where the new Church is located is used for residences, we needed to completely soundproof the Main Sanctuary; we installed sound attenuation panels on all wall and ceiling surfaces. It was not necessary to soundproof the floor areas as the downstairs was owned and occupied by the Church - Though we did use carpet as a sound inhibitor.
Renovation Construction Drawings
Renovation Photos
Main Sanctuary - During Construction
ABOVE - Main Sanctuary: We installed sound attenuation panels on all wall and ceiling surfaces. We then installed scrim and plaster over the panels and painted all surfaces.